Pertecnica / Case Study
How Production Efficiency Was Improved by 50% in a Transformer Manufacturing Plant
A transformer manufacturing plant was facing a common problem: people were working hard, but production was not moving fast enough.Production activities, working methods and process times were reviewed on the shop floor. By changing the way work was organised and removing unnecessary delays, production efficiency improved by approximately 50%.
5Case Sections
1Training Areas
APPLIED ENGINEERING
CASE / 56077
PROJECT STORY
Challenge · Method · Solution · Outcome
PROJECT AT A GLANCE
From engineering challenge to practical outcome
Industry / disciplineCASE STUDIES
Project story5 documented stages
Executive SummaryThe project in one view.
- The production team studied the actual work being carried out on the shop floor.
- The time required for different activities was measured. Delays, unnecessary movement, waiting time and inefficient work sequences were identified.
- The production process was then reorganised.
- Some activities were rearranged, some unnecessary steps were removed and available resources were better balanced.
- The result was an approximately 50% improvement in production efficiency.
- The important lesson was that a large improvement did not always require a large investment.
Project BackgroundContext, scope and operating environment.
- The factory had experienced production delays and differences in the time taken to complete similar activities.
- Instead of immediately adding manpower or equipment, the production process itself was studied.
- The objective was simple:
- Find where time was being lost and make the work flow better.
Engineering ChallengeThe problem, constraint, risk or objective.
The main problems were:
- Production was taking longer than necessary
- Some activities were creating delays for other activities
- Work was not evenly balanced
- Actual process times were not clearly understood
- Manpower and resources were not being used as efficiently as possible
Method & SolutionThe engineering approach and technical reasoning.
- Engineering Methodology and Implementation
- Observe the actual work
- The production process was studied directly on the shop floor.
- Measure the time
- Time studies were used to understand how long different activities actually took.
- Find the delays
- Activities causing waiting, unnecessary movement and process interruptions were identified.
- Rearrange the work
- The sequence of activities was changed wherever a better flow was possible.
- Improve resource utilisation
- Manpower and production resources were better matched with the actual work requirements.
- Monitor the improvement
- Production performance was reviewed after implementation to ensure that the improvement was sustained.
Solution / ImplementationWhat was implemented in practice.
The improvement delivered:
- Approximately 50% higher production efficiency
- Better use of existing manpower
- Smoother production flow
- Less unnecessary waiting and movement
- Better understanding of actual production times
- Improved production discipline